Banner

新闻详情

Home > News > Content

Maintenance and maintenance of Xinxiang Dacromet coating processing

Edit:Xinxiang Chui Auto Parts Co., Ltd.UpDate:2018-08-22

Xinxiang Dacromet is a new type of surface treatment technology. Let's talk about the maintenance and maintenance of the coating machine:

1. After the main motor of the coating machine is running for a period of time, it is necessary to supplement the gearbox with No. 32 lubricating oil, and replace the No. 32 lubricating oil every 3000 hours;

2. Each bearing is added once a week with oil-lubricated oil-filled holes. For grease lubrication, check whether it needs to be replenished once a month. Remove the rubber roller and check the bearing lubrication condition. Related sprocket and chain Each rotating component should be refueled once every 100 hours of operation. A small amount of replenishment should not be too much, otherwise it is easy to contaminate the paint due to excess oil droplet splash during operation;

3. For the cleaning inside the drying tunnel, after 500 hours of operation, clean the internal residue, dirt, check whether the heating pipe can be heated normally, clean up; the dirt of the impeller of the operation fan, use the vacuum cleaner to remove the slag of the drying tunnel after cleaning. And then using compressed air to blow off the adsorbed residue;

4. In order to ensure the cleaning inside the drying tunnel, it is necessary to use the waste aluminum coating waste paint three to four times after cleaning, so as to adhere the drying tunnel to the drying tunnel without any mistake, so as to avoid contamination of the product during normal production.

The above is the maintenance and maintenance of Dacromet coating machine introduced by Xinxiang Dacromet manufacturer. I would like to know more detailed consultation, please call us for more information.